Level 3 Award In the Installation and Maintenance of Small Scale Solar Photovoltaic Systems
The following training and assessment packages are certificated by LCL Awards to industry led standards
Title | Content type |
---|---|
Qualification Title |
Level 3 Award In the Installation and Maintenance of Small Scale Solar Photovoltaic Systems |
Sector Subject Area (SSA) & Industry Sector |
|
LCL Awards Qualification Number |
IMSSSPV_22 |
Qualification Regulator(s) number |
|
Qualification Level and Credit Value |
Level: 3 Credits: 4 |
Qualification Duration |
35 GLH 35 TQT |
Qualification Unit Titles |
|
Qualification Information |
This regulated qualification is for learners wishing to achieve a regulated qualification in the Installation and Maintenance of SPV. This qualification is in accordance with BS 7671 Requirements for Electrical Installations and the IET Code of Practice for Grid Connected Solar Photovoltaic Systems. Learners undertaking this qualification will typically be updating their electrotechnical sector competence or undertaking continuous professional development.
This qualification has been updated to BS 7671:2018+A2:2022 and current industry requirements.
|
Design Standards |
|
Learning Outcomes and Assessment Criteria |
Learner will:
|
Prerequisites |
This qualification is aimed at experienced and practicing electrical operatives. On application for the qualification, the Approved Centre (AO) will carry out an Initial Assessment of the learner’s capability to complete the qualification. Learners holding the following will confirm their suitability to enrol on the qualification. Level 3 Electrotechnical vocational qualification which includes the initial verification and certification of electrical installations, and a Note: |
Examination and or Assessment method(s) |
|
Related Qualifications |
|
Related Document(s) |
|
Related links and support material |
IET Code of Practice |
Standard Qualification Fee– excludes VAT where applicable |
£63.35 |
Frequently asked questions about this course
How long does a domestic electrical installation certificate last?
Domestic electrical certificates, known as Electrical Installation Condition Reports (EICR), must be reviewed every 5 years in rented properties and are valid for up to 10 years for homeowners.
What is "Part P" of the Building Regulations?
Part P of the Building Regulations in the UK ensures electrical safety in residential buildings. It requires that all new electrical work is designed, installed, and tested to meet safety standards. Work must be carried out in accordance with BS 7671 - the IEE 18th Edition Wiring Regulations. Installers must be registered with an electrical self-certification scheme.
What qualifications do I need to install solar PV?
Most solar PV installers have electrical qualifications, such as a Level 3 Diploma, or an NVQ/SVQ. These qualifications can be gained at College, often through an apprenticeship scheme. The LCL Awards Level 3 Solar PV installation course is designed for installers who already hold a Level 3 electrotechnical vocational qualification and the latest edition of BS 7671 Wiring Regulations. LCL Awards' course is recognised by the Microgeneration Certification Scheme (MCS).